OFFICE OF THE MUNICIPAL ENGINEER

HEAD OF OFFICE

CONTACT DETAILS

Address:

Email:

Contact Number:

SERVICES OFFERED

SERVICE 1: SECURING INDIGENOUS ELECTRICAL PERMIT

Checklist of Requirements:

  • Land Title
  • Tax Declaration
  • Tax Receipt
  • Barangay Certificate
  • Picture of the House
HOW TO AVAIL:

CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME
Submit accomplished forms for Indigenous electrical requirements and wait for the assessment
Receives and conduct preliminary evaluation. Assess the permit fees and issue order of payment.
P 215.00
15 minutes
Submit documents to BFP upon payment
AFTER INSPECTION OF THE BFP
Submit fire safety inspection certificate
Receive and Prepare electrical permit number for approval
None
5 minutes
TOTAL
P 215.00
20 minutes

SERVICE 2: ISSUANCE OF OCCUPANCY PERMIT

Checklist of Requirements:

  • Building (Duly signed by Licensed Civil Engineer)
  • Electrical (Duly signed by Licensed Electrical Engineer)
  • Plumbing (Duly signed by Licensed Master Plumber)
HOW TO AVAIL:
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME
Submit approved building permit and completion forms
Receive the documents and assess fees
None
10 minutes
Pay fees to Municipal Treasurer's Office
Prepare order of payment
Based on National Building Code of the Philippines Schedule and Fees
5 minutes
Submit completion forms to BFP for issuance of Fire Safety Inspection Certificate
Prepare endorsement for final inspection to BFP
5 minutes
AFTER INSPECTION OF BFP
Submit Fire Safety Inspection Certificate
Receive and prepare Certificate of Occupancy
5 minutes
Receive approved Certificate of Occupancy
Release the approved Certificate of Occupancy
5 minutes
TOTAL
20 minutes

SERVICE 3: ISSUANCE OF BUILDING PERMIT

Checklist of Requirements:

  • Certified True Copy of Transfer Certificate of Title (5 photocopies)
  • Tax Declaration and Current Real Property Tax Receipt (5 photocopies)
  • In Case the applicant is not the registered owner of the lot, a duly notarized copy of the Contract of Lease or Deed of Absolute Sale or Contract of Sale
  • Accomplished application forms (5 copies) signed and sealed by a duly licensed professional and owner (provide a photocopy of PRC ID)
  • Minimum of five (5) sets plans and specifications prepared, original signed and sealed by a duly Licensed Professional
  1. Architect or Civil Engineer for Architectural and Structural Plans
  2. Sanitary Engineer or Master Plumber for Plumbing or Sanitary Installation Plans
  3. Professional Electrical Engineer for Electrical Plans
  4. Professional Mechanical Engineer for Mechanical Plans
  5. Bill of Materials and Cost Estimates should notarized
  • Structural Design Analysis and Computation for 2 storey and up
  • Soil Testing for more than two(2) storey suspended slab
  • Logbook
  • Zoning Certificate and Locational Clearance (5 photocopies)
  • Fire safety and control requirements of Fire Code of the Philippines
HOW TO AVAIL:
client steps agency action fees to be paid processing time
Apply and submit requirements with approved locational clearance and zoning certificate from MPDC
Receive the documents and evaluate; if complete, assess the fees.
20 minutes
Pay necessary fees
Prepare order of payment
Based on National Building Code of the Philippines Schedule of Fees
5 minutes
Apply Fire Safety Evaluation Clearance
Endorse to BFP the complete documents
5 minutes
AFTER EVALUATION OF THE BFP
Submit Fire Safety Evaluation certificate issued by BFP
Receive and issue permit number for approval
15 minutes
Receive the approved building permit
Sign and release the approved building permit
5 minutes
TOTAL
50 minutes